Replacement Engine
Posted: Tue Aug 29, 2023 9:27 pm
After the issue of the coolant cap coming off mid-drive and causing the engine to massively overheat, i've been quoted £3500 to fit a new engine in my Bongo (Ford Freda).
Is that high? It's ADS, who are Bongo specialists in Bristol. I've never had an issue with them before, they're very good. He said they get the engine imported and would need a deposit before ordering.
Other question I have is - he said as part of the job they replace all the vitals at the same time - timing belt, water pump etc. I actually had all these done early this year - is this really required or will they have been affected by the engine overheating?
Edit - oh now I feel silly. I'm guessing the timing belt is part of the engine, and so he's saying when they get this replacement engine in they'll change the timing belt etc on it before passing to me.
Is that high? It's ADS, who are Bongo specialists in Bristol. I've never had an issue with them before, they're very good. He said they get the engine imported and would need a deposit before ordering.
Other question I have is - he said as part of the job they replace all the vitals at the same time - timing belt, water pump etc. I actually had all these done early this year - is this really required or will they have been affected by the engine overheating?
Edit - oh now I feel silly. I'm guessing the timing belt is part of the engine, and so he's saying when they get this replacement engine in they'll change the timing belt etc on it before passing to me.